Module 03 · Inventory
Price lists and bulk updates
How to price lots (per m², by location, by phase) and how to update a project's price list in GoSoft by percentage or amount, with a preview and without touching signed contracts.
A lot's price isn't just "meters times value": a corner is worth more, a park view is worth more, and the same lot is worth more when the project has streets and power than when it was a pasture. The price list is updated several times in a project's life.
- Explain how a lot's price is built.
- Update the prices of a project, a block or a lot.
- Review the change before applying it.
How the price is built
| Factor | Example |
|---|---|
| Base price per m² | 300,000 per m² |
| Location | Corner +10 %, facing a park +8 %, next to an avenue +5 % |
| Size | Large lots sometimes lower the price per m² |
| Phase | Pre-sale at a discount; full price with works finished |
| Payment method | Cash with a discount; installments with interest or a higher price |
A 200 m² corner lot: 200 × 300,000 × 1.10 = 66,000,000.
When to update
- Moving from pre-sale to selling with works done.
- Because of inflation or changing costs.
- When one block sells faster than another (raise the one in demand).
- For a temporary promotion (lower, then go back).
Updating the list changes the price of available lots. Sold or reserved lots keep their contract price.
In GoSoft, step by step
Open Sales contracts → Sale prices. You'll see the properties with their area, price per m², total price and last update date.
Choose the scope: the whole project, a block or specific lots. By default only available lots, without a contract change.
Choose the operation: increase or decrease, by percentage or amount, or a new price per m².
Click Preview: GoSoft shows each lot with its current price, new price and difference, and the total portfolio value.
Bulk price update with preview If it's right, Confirm and apply. Prices change in the catalog, the site plan and quotes.
Before a big update, export the catalog to Excel. You'll have the previous list to compare or to go back to after a promotion.
Self-assessment
Base price 250,000 per m², 160 m² lot facing a park (+8 %). What is the price?
160 × 250,000 × 1.08 = 43,200,000.
When the list goes up 5 %, what happens to signed contracts?
Nothing: they keep their price. Only available lots change.
What is the preview for?
To check each new price and the difference before applying the change.